Coega Special Economic Zone & the Port of Ngqura

A fully-serviced SEZ with its own deep-water port, energy security programme and a 15% corporate tax incentive — engineered for capital-intensive export manufacturing.

Why Coega

Infrastructure That Compresses Risk

Established infrastructure

World-class deep-water port, reliable electricity and water treatment already in place across a 9,000+ hectare SEZ.

Energy security

Coega is developing its own renewable energy and battery storage solution for tenants.

Customs Controlled Area

Zone 1 is a CCA, allowing duty-free import of critical machinery.

Reduced logistics costs

Direct access to the export market via the Port of Ngqura — components in, cells out.

Support ecosystem

Synergies with renewable energy and automotive companies already in the zone.

Vermicom Coega Strategy

Five Levers That De-Risk the Build

Priority Access

Secure land and utilities at the Coega SEZ in Port Elizabeth.

Technology Transfer

Signed agreements with US and German partners for advanced cell manufacturing and Gigafactory-in-a-box technology.

Local Inputs

MoU with a South African chemical giant for precursor (pCAM) production.

Circular Economy

Collaboration with a licensed WEEE recycler for black-mass recovery and battery second-life applications.

Academic Collaboration

Joint research with Nelson Mandela University (NMU) and Stellenbosch University (SU) on next-generation battery material.

Site Requirements

Designing for Ramp — 1 GWh to 5 GWh

The plant is sized to commission at utility scale and expand to full capacity within the same precinct.

Site requirement figures to be finalised in the Bankable Feasibility Study (BFS).

1 GWh

First phase
Area under roof (sqm)
{{TBD}}
Water demand (m³/day)
{{TBD}}
Power draw (MW)
{{TBD}}

5 GWh

Full ramp
Area under roof (sqm)
{{TBD}}
Water demand (m³/day)
{{TBD}}
Power draw (MW)
{{TBD}}

Location

Port of Ngqura Precinct, Coega SEZ

Coega Industrial Development Zone, Zone 1 precinct, Gqeberha (Port Elizabeth), Eastern Cape.

Map adapted to the brand palette. A fully custom Mapbox style is applied on the production build with a map token ({{TBD}}).

Project Roadmap

2026–2029: From Feasibility to Full Production

Hover or tap a phase to inspect its date range and scope.

20262027202820292029

Feasibility Study & Fundraising

20262026

Bankable Feasibility Study (BFS) and Front-End Engineering Design (FEED) for a 1–5 GWh facility.